Scroll to top
DE
EN
Search for:
Search:
Menu
Home
Wall Heating
Underfloor Heating
Ceiling Heating
Cooling
Clay Plaster
References
Experience surface heating for yourself
SEINZ Wisdom Resort BioHotel
Vinotheque Organic Winery
Restaurant Cross-Over
After-school care center
Hotel Taj Theog India
Commercial construction
Hotel Sand Italy
Gud Jard Holiday Resort
Hotel Sleepwood
Frisian Country Hotel
Castle Estate Bio Hotel
Hairdresser on fire
Organic vineyard Rhine
Commercial Building
Ayurveda farm in Bavaria
Country Hotel Rössle
Hotel zur Post Germany
der daberer. the biohotel
Holiday farm Black Forest
Monument barn restaurant
Restaurant in old vault
Protected monument Hotel
Hotel Urthaler Italy
Baltic Sea holiday estate
Detmold State Museum
Conference centre
Museum in the hunting lodge
Bike and relax hotel Italy
Customer testimonials
Installation examples
House in Swedish style
Historic winegrower's house
King Ludwigs Bodyguard's house
Multistorey timber house
Renovation plus extension
Renovation Old Building
Climate Ceiling Old building
Renovation urban villa
Electrical Climate Panels
Residential / Commercial
Architect's wooden house
Listed building from 1679
Architect's flat
Loft industrial style
Renovation historic farm
Hexagon House
Solid wood house
Timber frame house
Manor for seniors
Cooling with Climate Ceiling
Conversion and extension
Underfloor heating
Services
Products
Climate Panel
Climate Grid
Underfloor heating
Clay Panel
Clay plaster
WEM Clay Paint
Installation
Dry construction
Wet Construction
Ceiling installation
Hydraulic Installation
Information material
Online Calculation Tool
International Partners
Home
Services
Installation
Wet Construction
Wet construction: Installation of WEM Climate Grids
How to mount the WEM Climate Grid on the wall
The first Climate Grid is fixed with screws and/or dowels, depending on the substrate.
The second climate grid is fastened next to the first one.
The pipe ends of the climate grids are connected to each other with press fittings.
The connections are pressed.
How to continue: Connecting, plastering, painting
The pipes are connected to the heating circuit manifold.
The heating surface is pre-plastered with WEM clay universal plaster.
When the base coat is dry, a layer of WEM clay fine plaster is applied. At the same time, the heat-resistant reinforcement fabric is worked in. The surface can be made rough or smooth as desired.
Finally paint, e.g. with our WEM clay paint. Ready to enjoy!
Technical information / Brochure
WEM Wall heating |Brochure (PDF)
Wet construction wall heating
Installation instruction WEM wet construction system for wall heating/cooling
Technical product information WEM Climate grid
Technical product information WEM Climate pipe system