Wet construction: Installation of WEM Climate Grids
How to mount the WEM Climate Grid on the wall
The first Climate Grid is fixed with screws and/or dowels, depending on the substrate.
The second climate grid is fastened next to the first one.
The pipe ends of the climate grids are connected to each other with press fittings.
The connections are pressed.
How to continue: Connecting, plastering, painting
The pipes are connected to the heating circuit manifold.
The heating surface is pre-plastered with WEM clay universal plaster.
When the base coat is dry, a layer of WEM clay fine plaster is applied. At the same time, the heat-resistant reinforcement fabric is worked in. The surface can be made rough or smooth as desired.
Finally paint, e.g. with our WEM clay paint. Ready to enjoy!